The Ohio Department of Transportation has issued an updated construction report for Clinton County. The agency says all listed operations depend on weather, and it directs drivers to ohgo.com for current road conditions.
On Interstate 71, resurfacing between the Smith Road and Gurneyville Road overpasses will leave at least one lane open in each direction. Crews are scheduled to work nightly from about 9 p.m. to 7 a.m., with completion estimated for November 2026.
State Route 134 stays closed through mid-November for a bridge replacement over the East Fork Little Miami River north of state Route 124, near the Highland County line. ODOT lists a detour using U.S. 50, U.S. 68 and state Route 28.
On state Route 28, flaggers handle daytime traffic between state Route 73 and Phillips Road in New Vienna, while guardrail replacement runs from west of Gibson Road at Martinsville to state Route 73 in New Vienna, with one lane kept open.
Other work includes culvert repairs on state routes 72, 350 and 380, bridge rehabilitation on state Route 133 in Blanchester, and resurfacing on state routes 350 and 730 and U.S. 22. Davids Drive in Wilmington remains closed between Rombach Avenue and Lynne Lane through mid-November.
Completion estimates range from September 2026 for the state Route 72 and state Route 380 culvert work to November 2026 for most larger projects, with one state Route 350 resurfacing job listed for October 2026.