Knox County's newest municipal well is likely drawing elevated iron because a bentonite seal around its casing failed, water/wastewater Director Jeff Pickrell told county commissioners during the week ending Nov. 21, 2026. Well No. 7 was drilled late in the summer. The drilling contractor returned that week to expose the casing and repair the seal. Pickrell said the work will move the project's completion into 2027. The well is drawing from the upper part of the formation, and Ohio EPA has not yet approved the permit to install while data collection continues.
Crews finished oil changes on 25 stationary generators and began load-testing the diesel units; the wastewater plant's largest unit runs five hours under load. In Pleasant View Acres, 17 repairs were made to keep groundwater out of sewers, with contractors handling deeper work. Most involved old clay-tile mains whose joints roots had widened, and some laterals were severed. Pickrell said fiber-optic installation in Apple Valley has caused many hits. Mercury Broadband has paid part of the damage its subcontractors caused to water mains, sewer lines and meter equipment, according to the briefing.
December work includes a two-day ice-pigging cleanup of four pump stations, allowed if temperatures remain above 12 degrees. An Ohio EPA audit found the department did not document valve exercising; crews use a battery-powered turner on 250 to 300 valves and log the turns on work orders. Staff are training on Software Solutions' new billing system, with a February switch expected. Paving at the new administration building could start that week; interior work is nearly done, but electrical service awaits a state panel inspection before the transformer is set. Pickrell hopes to move in by Jan. 1.